Company Profile:
HEHUA
Founded in 2005, and its subsidiary company Hehua Machinery Technology (Kunshan) Co., Ltd. was founded in 2018 with a registered capital of 2 million yuan and more than 100 employees. The company passed ISO9001 in 2009, TS16949 in 2015 and IATF16949 in 2018. Specialize in all kinds of metal processing: laser cutting, flame cutting, sheet metal, CNC machining, stamping, mould and large welding structural parts.
The main equipment includes:
Dazu fiber laser cutting machine, Gantry Machining Center, CNC machine, milling machine, large 12-meter flame cutting machine, edm line cutting machine, lathe machine, large vertical lathe machine, grinder, shearer, 25~400 tons punch, bending machine, welding machine, etc.
Hehua's main products are automotive stamping parts, exhaust pipes, sheet metal parts of rail transit equipment and motor machining products. It mainly produces sheet metal parts of subway doors, shielding doors and air conditioner for Wabtec Faiveley; automotive stamping parts for Ford, Benz, Audi, Roewe and other motor corporation; lathing, machining, welding parts of motor for ABB; frame and finishing parts of wire equipment for Yazaki; equipment accessories of garbage squeezing and fruit/vegetable machine for Longcheng; etc.
Product Description:
Product Name |
Progressive Die,Metal Stamping Die by Shanghai Hehua Company |
Certification |
ISO9001:2008 |
Moulds-Building Time |
20-35 Days |
Size |
customized |
Service |
OEM ODM |
Mould material |
SKD11 45# Cr12Mov Misumi Punching |
Mould life |
100000-500000/pcs |
MOQ |
1SET |
FAQ:
1.what is your product range?
CUSTOM machined/stamped/casting/extrusion/spring
2.What about your sample policy?
Simple sample,charge express fee only,complicated sample,will refund after place mass order
3.What's your payment term?
Sample: 100% before produce Batch:50% deposit 50% before shipping
4.What kind of payment does your factory accept?
T/T Paypal Western Union L/C
5.What about the delivery time?
Normal mold time: 10-12 days Machined parts: 3-5 days Batch: 10-15 days depend on quantit
6.How about your after-service?
Quality issue,If it is our fault,100% remake or as customer's requirement,if not our fault,try our best to give some discount to remake.